Weymoor Bridge Stream Culvert
After canal abandonment a drainage channel was cut through the canal bed adjacent to Weymoor Bridge.
In 2024 the first phase of constructing a new culvert to take the drainage channel under the canal was completed.
The second phase of work during 2025-26 completed the culvert and extended the channel walls above and reinstating the canal towpath.
Weymoor Bridge Spill Weir
One hundred metres or so east from the bridge are the remains of a spill weir that would have allowed excess water in the canal to flow out into a branch of the River Churn. which is close by.
(Tap / click images to enlarge)