The two disused gas pipelines that were attached to the front of this bridge have been removed, the last in May 2012. The pipeline on the other side of the bridge has also been removed.
(Tap / click images to enlarge)
The two disused gas pipelines that were attached to the front of this bridge have been removed, the last in May 2012. The pipeline on the other side of the bridge has also been removed.
(Tap / click images to enlarge)
Canal: Stroudwater
Restoration Phase: 1A
Status: Complete
Access: Towpath
Listed Building Grade II
Updated: 15/01/2018