The re-building of this bridge was completed in May 2008. The bridge was built on the demolished remains of the original brick arch bridge.
(Tap / click images to enlarge)
The re-building of this bridge was completed in May 2008. The bridge was built on the demolished remains of the original brick arch bridge.
(Tap / click images to enlarge)
Canal: Stroudwater
Restoration Phase: 1A
Status: Complete
Access: Towpath / highway
Updated: 01/03/2018