The restoration of Dudbridge Lower Lock was completed in 2013.
(Tap / click images to enlarge)
The restoration of Dudbridge Lower Lock was completed in 2013.
(Tap / click images to enlarge)
Canal: Stroudwater
Restoration Phase: 1A
Status: Complete
Access: Towpath
Updated: 24/08/2023