Phase 1A Restoration

Phase 1B Restoration

Stroudwater Navigation

Thames & Severn Canal

 

Restoration Plans - Phase 1A

Below are some of the plans for the restoration of various structures on the Phase 1A restoration section of the Cotswold Canals. This information (and much more) is available on the Stroud District Council (SDC) website, and is provided here for ease of access.

Please note, links to SDC plans on this site are provided for convenience only, and may not be up to date.

The plans are in Adobe PDF format, so Abobe Reader will need to be installed in order to view them. (Tip: pressing 'CTRL SHIFT -' will rotate the plan to the correct orientation)

Most of the files are 1-2 Mbytes in size and may take a few moments to download, depending on your connection speed.

Ocean Swing Bridge - Stonehouse

Demolition of Ocean Swing Bridge and construction of a new swing bridge in the same location.

General Arrangement

Site Plan

(SDC Planning Ref. S.10/1869/FUL - Approved)

Ebley Mill to Wallbridge

Restoration of a 1.6km section of the Stroudwater Canal from Ebley Mill to Wallbridge, including widening the canal, new lock gates at Dudbridge upper and lower locks, flood gates at Ebley Mill, Overflow weir, confluence weir and fish pass, replacement of Gasworks Bridge and Lodgemore Bridge and removal of Marling school bridge. (Note: Lodgemore Bridge is subject to a re-design and, as a consequence, its construction is delayed.)

Ebley Weirs & Flood Gate - Plan

Ebley Flood Gate - General Arrangement

Ebley Overflow Weir - General Arrangement

Ebley Overflow Weir - Elevation

Ebley Confluence Weir - General Arrangement

Dudbridge Locks - Bypass Channel

Gasworks Bridge - General Arrangement

(SDC Planning Ref. S.10/1280/FUL - Approved)

Capel's Mill - New Canal Channel

The creation of a new section of waterway, stretching over 300 metres from Dr Newtons Way to Arundel Aqueduct.

Site Location Plan

General Arrangement

Preliminary Landscape Plan

(SDC Planning Ref. S.11/1714/FUL - Pending)

Hope Mill (Iron Works) Brimscombe - Canal Reinstatement

Construction of a canal channel through canal iron works, including a new bridge and lock, as well as demolition of (Industrial) units 2 and 3.

Site Location Plan

Proposed Canal Layout

Proposed New Lock

(SDC Planning Ref. S.11/0957/FUL - Pending)

Dudbridge Locks Hydro Scheme

Installation of hydro turbine.

Site Area Plan

Hydro Scheme General Arrangement

(SDC Planning Ref. S.11/0821/FUL - Approved)